Secure Site Clearance of End of Use product

Published on Tuesday, Mar 21 2017

We were asked to clear 200+ servers, workstations and peripherals from our client’s site in Central London.  Our client required collection within 4 days of advising us of the availability of the equipment and for a full inventory of the kit to be provided.  They also required secure data destruction for all of the installed drives and documentation for any items recycled.  The equipment was cleared from site in one morning utilising two 7.5 tonne tail lift loaders.  All the drives were data wiped over a 2 week period and a full inventory of the equipment, including installed items, provided within 4 weeks.  Less than 5% of the equipment had to be recycled with the rest becoming available for reuse.

Our client instructed a second smaller clearance of 50+ systems within 6 weeks of the first and since gone on to use our services for the clearance of 14 cabinets of assorted equipment.